Projects

Projects > Groundworks > Thurston "End of Platform Crossing - Network Rail

Thurston "End of Platform Crossing - Network Rail

HallBros successfully competed the works at Thurston for Network Rail. Safety measures are in placed. This works includes by breaking out and re-position the warning signal post. 

Breakout approximately 2m x 4 m x 70 mm, regulate base and tac coat. Installed new 6mm wearing course in 2 layers and compact using wacker plate and pedestrian roller to new line and level. Next phase is breakout temporary tarmac in the 6 foot and installed new 6mm wearing course to new line and level.

In the car park side, breakout from the back of rubbers approximately 20msq from bottom of signal ladder to new fence line. Breakout timber post and fence ,extend path by 300 mm, re-install timber posts and re-fix fence to new line. Remove signal post and move down track 300 mm if its possible to do so. Installed timber edging from rubbers to signal post ladder. Installed overband and new white lines. Cut and re-adjust galvanized hand rails to suite newly moved fence line as discussed on site with clients representative.

Contact us and find out more

Wish to discuss our services in more detail? We'd be delighted to hear from you and discuss your requirements further. Please get in touch using the details below and we will respond as soon as possible.

Please enter your name.

Please enter your email.

Your email is in the wrong format.

Please enter your telephone number.

Please enter your message.

Please confirm you are not a robot.

Contact information