Installation of new 30/14 HRA, 4 cats eyes and lining works - Network Rail
Groundworks
31.08.2021
Hilgay Level Crossing
HallBros to carry out maintenance work for Network Rail at Hilgay Level Crossing. Plane out area from track to stop lines approximately 121.59 m sq to a depth of approximately 80 mm. Regulate base and tack coat and seal edges. Successfully installed new 30/14 HRA with 20 mm pre coated stone chippings to existing line and level, 4 numbers of cats eyes and lining.